INDUSTRY SOLUTIONS

Industry Solutions

Industry solutions covering business scenarios, functional planning, integration and delivery acceptance.

Solution Categories⌄
FROM BUSINESS CHALLENGES TO SYSTEM DESIGN

Choose your industry and explore a practical solution.

Resolve reporting discrepancies by separating input, accepted output and rework
Manufacturing Execution System (MES)

Resolve reporting discrepancies by separating input, accepted output and rework

The output mentioned on site may refer to the quantity completed by processing, or it may refer to the quantity passed through inspection. If different teams each fill in a number, it will be easy to double-count reworked parts when summarizing. MES reporting needs to first explain the business meaning of the quantity, and then decide how to count the Kanban.

Explore Solution
Protect completed operations when sales orders change
Enterprise Resource Planning (ERP)

Protect completed operations when sales orders change

When the customer adjusts the quantity or delivery date, an order may already have shipping, purchasing or production tasks. Directly editing the original order will make the execution record lose its basis. Order changes need to describe the differences and distinguish between the parts of the business that have not yet been executed and those that have been executed.

Explore Solution
Handling mismatches between barcodes and received goods
Warehouse Management System (WMS)

Handling mismatches between barcodes and received goods

Successful barcode scanning only means that the code has been recognized, but it does not mean that the goods, quantities and batches are correct. Supplier labels may have missing fields or may use old packaging. The WMS receipt page should display the material information that needs to be confirmed, allowing differences to be processed instead of being recorded uniformly.

Explore Solution
The supplier confirms the delivery date, which versions should be retained in the system
Supply Chain Management System

The supplier confirms the delivery date, which versions should be retained in the system

After the purchase order is issued, the supplier may promise to deliver in batches or may adjust the date multiple times. Saving only the last delivery date will make it impossible for procurement to distinguish between the original commitment and the current arrangement. Delivery confirmation needs to be an independent collaboration record and associated with the order line.

Explore Solution
Handling temporary resource changes in transport dispatch
Transportation Management System (TMS)

Handling temporary resource changes in transport dispatch

After the dispatch plan is released, vehicles, carrier resources or loading conditions may change temporarily. Changing the resource number directly will cause the previous confirmation to lose association with the voucher. The TMS should retain the change process so that the site knows which arrangements are valid and which requirements need to be re-examined.

Explore Solution
How to get engineering materials to the construction site
Construction Project Management System

How to get engineering materials to the construction site

After the materials are taken from the warehouse, if only the person who receives them is recorded, it will be difficult for the project accounting to explain where the materials are used. Engineering material management should link the receipt, return and allocation to the construction site, which not only supports on-site operations, but also can find out the specific basis for quantity changes.

Explore Solution
Configuring property fee periods and calculation rules
Property & Industrial Park Management System

Configuring property fee periods and calculation rules

Park rent, property fees, and energy consumption are calculated in different ways, and the charging system cannot stuff them all into a fixed amount field. The project should have a clear billing cycle, basic amount and effective scope, so that the bill can explain where the fees come from.

Explore Solution
Link test method versions to original records
Laboratory Information Management System (LIMS)

Link test method versions to original records

After the detection method is adjusted, old tasks still need to indicate the version used. Only the latest files are saved in the database, making it difficult to trace historical results. LIMS method management should establish a traceable relationship between method versions, task configurations and original records to avoid current definitions changing past records.

Explore Solution
LET’S BUILD TOGETHER

Turn business ideas into reliable software.

From requirement sorting to online iteration, work with Gongqixin to find the digital path that suits you.

Let's Talk About Your Project
LET’S CONNECT

Discuss Your Project on WeChat

WeChat contact QR code

Scan with WeChat to add our contact.

Save or screenshot this code, then open WeChat Scan → Album to add our contact.

Open WeChatSave QR Code
If your browser cannot open WeChat, use its camera or album scanner.
LET’S TALK

Scan to Call and Discuss Your Project

15232589677

Scan with your phone camera or QR scanner, then confirm the call.

If your scanner does not support phone links, enter the number manually.