The function of first article inspection is to confirm whether the current preparation conditions can enter normal production. If the inspection form is only filled in afterwards and a large number of work orders have been reported, the system will lose process constraints. It is necessary to set inspection nodes according to the actual process and clarify the task status when it fails.
How to arrange records and operations
After the preparation for the start of construction is completed, the first article inspection task will be generated, and the results will be registered by authorized personnel. When it is not completed or unqualified, the corresponding process will be restricted from continuing to be released, and the reasons for the processing will be given. After adjusting the parameters, retest and retain each result and parameter change instead of changing the failure record to pass.
The first article determination conditions need to be related to the product, equipment and process preparation status. Whether to re-inspect the first inspection after changing molds, adjusting key parameters or shutting down for a long time should be agreed upon by the production and quality positions. The system should not release all tasks just because there is a qualified list on that day. Inspection tasks record measurement items, actual values, units and judgment basis; if necessary items are missing, remain unfinished. After passing the re-inspection, only work orders within the specified range will be released from restrictions.
Specific scenarios that need to be checked
During acceptance, let the operator and inspector use their respective accounts to check whether the node can be bypassed. For businesses that allow a small amount of trial production to be carried out first, the quantity and destination of the trial production should be clarified. Abnormal release requires separate approval, and the authorizer and applicable scope can be seen on the query page.