Project consultation does not require the preparation of a thick plan first. Clearly explain the business problems, usage positions, and existing tools, so that you can easily determine whether you need to discuss process improvement, system connection, or new system construction. It can also reduce the scope of repeated confirmation around names.

Problem Description

Describe how the business currently operates, what issues most affect efficiency, and which positions are expected to use the system. Desensitized sample forms or process descriptions can be used instead of sending complete production data in the initial communication.

Existing systems

List the software and equipment that have been used, indicating which functions you want to retain and which places need to be connected. The data helps determine the boundaries of development and integration, and avoids different modules repeatedly undertaking the same business.

Contact information

The consultation phone number is 15232589677 and the email address is 328317817@qq.com. When contacting, you can explain the industry direction and matters of concern. The specific scope, cycle and cost need to be further discussed based on the project information.

Scenario verification

The initial information can briefly list three contents: business pain points, usage positions and existing tools. If sensitive information is involved, first describe the fields and processes, and then decide whether to provide desensitized examples based on the scope of project communication.

Specific verification method

Prepare a current business, explain who inputs it and who processes it; list stuck links and expected results; state the names and confirmable interfaces of existing tools; use desensitized content in the example first, do not provide all original data as a condition for initial communication, and undetermined matters are listed separately.

Gongqixin can be contacted at 15232589677 or 328317817@qq.com. The initial information focuses on explaining the problems and positions, and then the functions, deployment conditions, and data usage methods are discussed based on the actual project scope.